GO#45: FIRE STATION 1 – Design Renderings

Scope: Replace the deteriorated Fire Station #1 facility with a new and larger building in a location that expands emergency coverage in South Beach.

Screen Shot 2021-10-12 at 11.57.25 AM
Screen Shot 2021-10-12 at 11.57.44 AM
Screen Shot 2021-10-12 at 11.58.02 AM
Screen Shot 2021-09-28 at 1.33.04 PM

Renderings and video by: Wannemacher Jensen Architects

The full presentation is available HERE.

Note: These renderings are preliminary, at the 30% design phase.