GO#45: Fire Station #1 – Design Renderings

Scope: Replace the deteriorated Fire Station #1 facility with a new and larger building in a location that expands emergency coverage in South Beach. NOTE: The total G.O. Bond budget for this project is $10 million. $4 million is to be allocated in Tranche 1 and $6 million is to be allocated in Tranche 2.

pic 1
05-08-2023 Apollo Mural HPB pic 2_Page_8
pic 2
pic 3

Design by: Daniel Buren